
35.7M
TEA high-rise building under construction, focusing on the column and wall formwork system. Heavy steel shuttering panels are stacked floor by floor, tightly clamped to shape reinforced concrete as it is poured and cured.
At the center, exposed reinforcement bars (rebar) form the core of a vertical structural element, which will later be fully encased in concrete. The precise alignment of the formwork ensures strength, load-bearing capacity, and uniformity across multiple floors. #tech #technology #manufacturing #innovation
@tech_hype__










